THE INFRASTRUCTURE AND SUPERSTRUCTURE OF KUŞADASI GETS STRONGER WITH EVERY DAY

Kuşadası Municipality, which has provided 269 kilometres of new roads to the city since Mayor Ömer Günel took office in 2019, continues its infrastructure and superstructure renovation works uninterruptedly. In this context, the Public Works and Engineering Department teams are now covering the 580th Street in Ladies Beach District with hot asphalt.
The renovation works carried out by Kuşadası Municipality to permanently solve the infrastructure and superstructure problems of the city continue simultaneously in different districts of the city. In this context, the Public Works and Engineering Department teams continue road construction works within the determined program. The teams, who work 24/7 to provide the city with modern and comfortable roads, are now carrying out hot asphalt work on Ladies Beach District’s 580th Street, where they have already laid 260 meters of rainwater line. The work carried out on an area of approximately 3,500 square meters will be completed in a short time.
IMMEDIATE INTERVENTION, IMMEDIATE SOLUTION
On the other hand, damages and deteriorations on the roads caused by the works carried out by institutions operating in the fields of electricity, water, sewage, internet, telephone, and natural gas are also fixed by the Emergency Response Unit teams in the shortest time possible. The work of the Emergency Response Unit teams, who are on duty 24 hours a day to prevent the residents of the city from suffering, is welcomed by all.